Skip to content

Fire engineering for a premium-grade CBD office tower

Dr Mohammad Ghaffari · Arup · 2025 to now

Context

Modern workplace design pushes toward open interconnection, generous lobbies, and transparency, all of which sit in tension with prescriptive compartmentation and egress rules. On a premium CBD tower, the fire strategy has to enable the architecture rather than fight it.

Contribution

I was the fire safety engineer preparing the fire engineering assessment and supporting the design team through design development.

Approach

  • Alternative solutions for interconnected floors and egress arrangements.
  • Smoke hazard management assessment for large-volume spaces.
  • Evacuation modelling to verify occupant egress performance.
  • Consultation with the certifier and fire brigade through the approval pathway.

Outcome

Fire engineering deliverables that carry the architectural intent through the compliance process.

  • NCC Performance Solutions
  • Pathfinder
  • Smoke hazard management
  • Fire Engineering Report (FER)

Commercial project. Details generalised.